(123) 456-7890 (123) 456-7890 info@companyname.com

HDB Standard BTO Package

3RM PACKAGE
$13,180

4RM PACKAGE
$14,180

5RM PACKAGE
$15,180

EXE & MAS
$16,180

FACTORS FOR INTERIOR DESIGING COSTS

When calculating the cost of your home renovation, several factors come into play. The main ones to look out for are:

The size and type of your property (HDB, condo or landed, etc.)
The type and extent of work required
Who you hire to do your renovation
The status of your property, whether brand new or resale
The materials you want to use
Size of your property

WHAT’S THE AVERAGE COST OF HDB HOME RENOVATIONS IN SINGAPORE?

Type of HDB Flat Average Renovation Cost For A New Flat Average Renovation Cost For A Resale Flat
3-Room (60 to 65 sqm) $32,000 $42,600
4-Room (90 sqm) $42,600 $58,500
5-Room (110 sqm) $52,100 $65,200

Source: AsiaOne

100% FREE

✔ MITSUBISHI SYSTEM 3 STARMEX ✅✅✅✅✅
✔ STAINLESS STEEL SINK
✔ CHROME LEVER TAP

A. CARPENTRY WORKS IN KITCHEN

  • Design & install 10ft top kitchen cabinet (laminated) + ABS
  • Design & install 10ft Bottom kitchen cabinet (laminated) +ABS
  • Supply & install 10ft Quartz surface work top
  • Supply & install new 2-Tier Stainless Steel Dish drainer-1 set
  • Supply labour to install cooker hob & hood into Kitchen cabinet
  • Supply & install with 1 no Frosted Glass Panel

B. WET WORKS IN KITCHEN

  • Supply & construct base for cabinet, with tiles
  • Supply & construct base for washing machine, with tiles
  • Supply & construct base for Refrigerator, with tiles
  • Supply & construct 1 no shower kerb,with tiles

C. CEILING WORKS

  • Supply & construct L-Box light holders in living area
  • Supply & construct false ceiling at foyer entrance
  • Supply & construct false ceiling at bedroom’s entrance

D. PLUMBING WORKS

  • Supply & install water inlet pipe for sink in kitchen
  • Supply & install water outlet pipe for sink in kitchen
  • Supply & install water inlet pipe for washing machine in kitchen
  • Supply & install outlet pipe for washing machine in kitchen
  • Supply labour to install 2 sets toilets accessories in 2 toilets
  • Supply labour to install 2 nos Mirrors in 2 toilets
  • Supply labour to connect water pipe for 1 set Gas Heater.
  • Supply labour to install 1 no washing machine tap

E. ELECTRICAL WORKS

  • Supply labour to install 10 ceiling light
  • Supply labour to connect 2 instant heater
  • Supply labour to connect hob in kitchen cabinet
  • Supply labour to connect hood into kitchen cabinet
  • Supply labour to connect door bell at existing Points

F. PAINTING WORKS

  • To paint whole house, using Nippon Paint 5 in 1
  • To paint whole house copper/pvc pipes
  • To paint or varnish for whole house doors, main door included
  • To paint or varnish for whole house door frame

G. MISCELLANEOUS ITEMS

  • Supply labour with acid washing whole house
  • Supply labour to clean up whole house windows & grills
  • Supply Corrugated board to protect whole house existing flooring
  • Supply labour to summit HDB application, for all renovation Works

H. SHOWER SCREEN

  • Supply & install 10mm tempered glass shower screen in main toilet

I. FLOOR WORKS (600mm X 600mm)

  • Supply & lay Polished Homogenous Floor Tiles for Living Area
  • Supply & lay Polished Homogenous Floor Tiles for Dining Area
  • Supply & lay Vinyl Flooring for all Bedrooms.
  • Supply & lay Homogenous / PVC skirting for Living/Dining & bedrooms

CONTACT US FOR YOUR INTERIOR DESIGN NEEDS TODAY GET FREE QUOTE